PVHS Building E Lobby & Corridor Flooring Replacement Project

The Project consists of removal of existing flooring including existing crack filler, existing adhesive and existing wall base. Prepare concrete floor slab including repair work and install dust protection, new moisture control system, new resilient flooring and new wall base.
Addendum 1 (click to expand/collapse)