CUPCCAA 10-Day Informal bid package for the De Anza Gymnasium Partial Floor Replacement

The project consists of partial replacement of existing gymnasium floor, repairing existing surfaces defects as needed to receive new coating finishes, and striping to match existing.
Addendum 1 (click to expand/collapse)