Kennedy HS Temp Campus Site Improvements, Project #1000004438
The project consists of sawcut and remove ac paving, patch ac paving where play structures were removed. New slurry seal throughout the temp campus. Repaint fire lanes, parking lot striping, and basketball striping.
Addendum 1
(click to expand/collapse)

Name | Size | |||
Addendum No. 1_Kennedy HS Temp Campus_Site Improvements_Final | 5.2 MB |